Preview of new I-10 and Loop 303 freeway interchange - Dallas News | myFOXdfw.com

Preview of new I-10 and Loop 303 freeway interchange

Posted: Updated:

The Arizona Department of Transportation is showing one of the elevated ramps that will eventually link I-10 and Loop 303 in Goodyear.

Several elevated ramps will be built throughout the interchange to provide direct connections between freeways.

In addition, Loop 303 will be widened to a six-lane freeway north of I-10 and a new portion of I-10 will be slightly shifted to the north through the area of the interchange.

The $134 million project is expected to be completed in fall 2014.

Powered by WorldNow

KDFW FOX 4
400 N. Griffin Street
Dallas, Texas 75202

Main Station Directory:
(214) 720-4444
News Fax:
(214) 720-3263 or (214) 720-3333

Didn't find what you were looking for?
All content © Copyright 2000 - 2014 Fox Television Stations, Inc. and Worldnow. All Rights Reserved.
Privacy Policy | New Terms of Service What's new | Ad Choices