Downtown Chicago bridge-lifting routine begins Saturday - Dallas News | myFOXdfw.com

Downtown Chicago bridge-lifting routine begins Saturday

Posted: Updated:
CHICAGO (Sun-Times Media Wire) -

A rite of spring hits Saturday when the city kicks off Chicago's boating season with the lifting of 27 bridges.

Bridges will rise sequentially every 8 to 12 minutes, from Ashland Avenue on the South Branch of the Chicago River to Lake Shore Drive, to allow recreational boats to access their docks and moorings.

The ritual begins at 8 a.m. Saturday and continues most Saturday and Wednesday mornings through Saturday, June 29th.

In a new twist this year, no bridges will be lifted from April 26 through May 5 due to work on the Wells Street Bridge during that period.

Follow Us!

Share Your Photos & Video

Powered by WorldNow

KDFW FOX 4
400 N. Griffin Street
Dallas, Texas 75202

Main Station Directory:
(214) 720-4444
News Fax:
(214) 720-3263 or (214) 720-3333

Didn't find what you were looking for?
All content © Copyright 2000 - 2014 Fox Television Stations, Inc. and Worldnow. All Rights Reserved.
Privacy Policy | Terms of Service | Ad Choices